Guide · UK social housing

Tenant Satisfaction Measures 2025/26: the results, the benchmarks and where repairs satisfaction is lost

The regulator published the 2025/26 results on 5 November 2026. Here are the benchmarks for every measure that matters, why tenants rate repair times lower than your on-time figures, and what moves TP03, TP07 and complaints before the next survey.

A phone with a chat thread, a clipboard with a rating survey and a rising bar chart

The Tenant Satisfaction Measures 2025/26 results, published by the Regulator of Social Housing on 5 November 2026, put the median large landlord at 74.2% overall tenant satisfaction, up from 72% a year earlier. Satisfaction with the time taken to complete repairs rose to 73%, but only 37.4% of tenants who complained were satisfied with how their complaint was handled (RSH headline report).

Kreedl is our product. It appears in this guide where it changes the outcome, and we say so each time. The figures and rules were checked against GOV.UK and the Housing Ombudsman on 13 November 2026.

TL;DR: the 2025/26 benchmarks

The table shows the median landlord and the middle half of landlords (lower to upper quartile) for low-cost rental homes, from 356 submissions by landlords with 1,000 or more homes.

TSM 2025/26 benchmarks for low-cost rental homes, median and middle half of landlords
MeasureMedian landlordMiddle half of landlords
TP01 Overall satisfaction74.2%68% to 80%
TP02 Satisfaction with repairs76.0%70% to 82%
TP03 Satisfaction with time taken to complete most recent repair73.0%67% to 79%
TP07 Keeps tenants informed about things that matter73.6%69% to 79%
TP06 Listens to views and acts upon them63.9%58% to 72%
TP09 Satisfaction with complaints handling37.4%31% to 45%
RP02 Non-emergency repairs completed within target85.3%77.8% to 91.7%
CH01 Stage one complaints per 1,000 homes56.839.8 to 78.7

Source: Tenant Satisfaction Measures 2025/26: Headline Report (RSH, 5 November 2026).

What are the Tenant Satisfaction Measures?

They are the 22 measures every social landlord in England reported for 2025/26: 12 tenant perception questions and 10 management information measures on repairs, safety checks, complaints and anti-social behaviour (RSH press release). They have applied continuously since 1 April 2023.

All registered providers must collect the measures and publish them annually “in a manner that is timely, clear, and easily accessed by tenants”. Providers that own 1,000 or more homes must also submit a data return to the regulator (TSM Direction). For large providers the reporting year runs from 1 April to 31 March. The 2025/26 return was due on or before 30 June 2026 (RSH, information required from registered providers).

Two things changed on 1 October 2026. The Transparency, Influence and Accountability Standard replaced the TSM Standard, and a new TSM Direction came into force (RSH, Transparency, Influence and Accountability). The Direction adds a 23rd measure, BS06, for electrical safety checks. If that one worries you, our guide to social housing electrical safety checks covers the deadline and the access records.

The regulator does not grade landlords on these numbers alone. The headline report says: “We do not use the TSMs as a regulatory tool in isolation.” They feed its view of how a landlord delivers the consumer standards, alongside everything else it collects.

What do the 2025/26 results show?

Satisfaction rose again, and the spread between landlords stayed wide. Tenants completed almost 500,000 surveys, over 458,000 of them in low-cost rental homes, covering April 2025 to March 2026.

  • Overall satisfaction (TP01): median 74.2%, up from 72% in 2024/25. One in six low-cost rental tenants (16%) said they were dissatisfied.
  • Repair times (TP03): median 73.0%, up from 67% in 2023/24. The press release calls it “the largest increase across the tenant perception TSMs”.
  • Repairs on time (RP02): 83% of non-emergency repairs across the sector were completed within target in 2025/26, against 77% in 2023/24. The median landlord reached 85.3% for non-emergency and 96.2% for emergency repairs.
  • Complaints (TP09, CH01, CH02): 86% of over 319,000 stage one complaints were answered within the Housing Ombudsman’s Complaint Handling Code timescales, up from 73% in 2023/24. Satisfaction with complaints handling was 37.4%, up from 35.5% in 2024/25.

Where you sit depends on who you are. Local authority tenants averaged 70.6% overall satisfaction, against 76.9% for housing associations and other private registered providers. Landlords with fewer than 5,000 homes had a median of 76.1%, landlords with 40,000 or more had 67.7%, and landlords with most of their homes in London had a median of just 63.1%. Compare yourself with landlords like you, not with the national median.

How you survey matters too. Telephone remains the most used method, with 65% of low-cost rental surveys and an average of 73.0% overall satisfaction. Postal surveys averaged 84.5% and internet surveys 64.5%. A change of method can move your score without any change in service, so read year-on-year movement with that in mind.

Why do tenants rate repair times lower than the on-time figures?

Because the two measures run on different clocks. RP02 counts repairs completed within the landlord’s own target timescale. TP03 asks the tenant: “How satisfied or dissatisfied are you with the time taken to complete your most recent repair after you reported it?” (TSM Direction).

The medians are not directly comparable, but the gap is worth a look: 85.3% of non-emergency repairs on target, 73.0% of tenants satisfied with the time taken. The tenant’s clock starts when they reported the problem. Your repair target may start only when a job is raised in your system. Anything between the two counts on the tenant’s clock only.

That gap is usually made of small delays nobody measures:

  • A voicemail left on Friday evening and played back on Monday morning.
  • An email or web form that waits in a queue before anyone raises a job.
  • A first call that ends without a reference number or a next step.
  • A missed appointment the tenant hears about only when nobody turns up.

None of these show up in RP02. All of them show up in TP03, and the last two show up in TP07 as well.

What actually moves TP03, TP07 and complaints?

Speed of the first response and updates the tenant does not have to chase. The regulator’s own summary points the same way: “The challenge now is to continue turning that insight into tangible improvements for residents,” said Kate Dodsworth, RSH Deputy Chief Executive (RSH press release).

Complaints follow repairs. In the Housing Ombudsman’s 2025-26 review, responsive repairs featured in 80% of the cases it determined, and it upheld 72% of its findings about repairs (Annual Complaints Review 2025-26). It found that when the most serious failings occur, residents “often experience excessive delays, poor communication” or a failure to adapt to their circumstances.

Landlords now answer most complaints on time. The median landlord answered 93.8% of stage one complaints within the Code’s timescales. Yet only 37.4% of tenants who complained were satisfied with how it was handled. Answering faster is no longer where the points are. They are in preventing the complaint: a report taken properly the first time and an update before the tenant has to ask.

The Complaint Handling Code sets the timescales once a complaint exists (Housing Ombudsman, Complaint Handling Code 2024):

Complaint Handling Code timescales by stage
StageAcknowledgeRespondExtension without good reason
Stage one5 working days from receipt10 working days from acknowledgementNo more than 10 working days
Stage two5 working days from the request20 working days from acknowledgementNo more than 20 working days

The Code has been statutory since 1 April 2024.

How we compared the ways teams take reports and keep tenants informed

We looked at the four common ways UK social landlords take repair reports and give updates today, and asked four questions of each. Does it take a report at any hour? Does it record the time the tenant reported, by itself? Does it tell the tenant what happens next? And does it keep updating them until the job is closed? We left out prices: they depend on stock size and change often.

Four ways to take repair reports and keep tenants informed, compared with Kreedl
OptionTakes reports at any hourRecords the report timeTells the tenant what happens nextUpdates until closed
Contact centre in office hours, voicemail afterNoPartlyIn office hoursDepends on staff
Online repairs portal or appYes, for tenants who use itYesPartlyPartly
Out-of-hours answering serviceYesYesBy scriptNo
Automated job texts from the repairs systemNo, only after a job existsNoYesOn status changes
AI building manager (Kreedl)YesYesBy your rulesYes

1. Contact centre in office hours, voicemail after

Your own staff take the call, know the stock and can raise the job while the tenant is on the line. That is the best first contact on this list, between 9 and 5. Outside those hours the report waits on voicemail or in a queue, and the tenant’s TP03 clock runs while nobody listens.

Best for: daytime reports and anything that needs a judgement call by someone who knows the estate.

Your contact centre answers in office hours. Kreedl answers the same report at 21:00, triages it and has a contractor on the way or the case ready for your team before they log in.

2. Online repairs portal or app

A portal records the report with a timestamp and photos, and lets the tenant see the job. It works well for tenants who use it. Not every tenant does, and a portal does not call anyone back. The tenant who reported a leak online and heard nothing for two days rates TP07 the same way as the one who could not get through.

Best for: routine, non-urgent repairs from tenants who prefer to self-serve.

A portal waits for the tenant to log in. Kreedl takes the same report by phone, text, WhatsApp or email and replies with the next step.

3. Out-of-hours answering service

A call centre answers in your name, follows a script and passes urgent reports to your on-call contractor. Every call is logged, which is a real step up from voicemail. The limit is what comes after: the operator usually cannot raise the job in your system, see the history or update the tenant the next day. The tenant is told someone will be in touch.

Best for: landlords who need a human voice at night and have an on-call team that can act on a short note.

An answering service passes the message on. Kreedl identifies the home, dispatches within your limits and keeps the tenant updated until the job is closed.

4. Automated job texts from the repairs system

Appointment confirmations and reminders from your repairs system help TP07 once a job exists. They cannot help with the hours or days before the job is raised, and they cannot answer the tenant’s reply “nobody came”.

Best for: appointment reminders on jobs that are already booked.

Job texts start when the job is raised. Kreedl starts when the tenant reports, and answers when they reply.

5. Where Kreedl fits

Kreedl is an AI building manager that answers residents around the clock.

It handles the steps between the tenant’s report and your repairs system, where the TP03 clock runs and TP07 is won or lost.

  • Calls
  • WhatsApp
  • SMS
  • Email
  • Picks up in 1.1 seconds on average, on every channel, at 3 PM or 3 AM.
  • Works out the home, the problem and how urgent it is, and logs the exact time of every report.
  • Dispatches a contractor from your approved list within the limits you set, confirms the fix and records it.
  • Follows up until the job is closed, so the tenant gets an update before they have to chase.
  • Escalates anything unusual to your team with the photos, the history and a recommended action. Every action is logged and auditable, and resolved requests are logged in your existing system.
  • Keeps the data in the EU, encrypted in transit and at rest, GDPR-compliant.

It does not fix the condition of a home, and it will not move TP04 or RP01 on its own. It makes sure no report waits until Monday, and that you can show what happened and when.

Best for: landlords of 1,000 homes upward that want every report taken at the first contact, triaged by their own rules and followed up, without adding a shift.

Which measure does each touchpoint move?

Use this table to decide where to start. It maps the measures most shaped by contact and updates to the moment that decides them.

The TSMs most shaped by contact and updates, and the moment that decides each
MeasureWhat the tenant is asked or what is countedThe moment that decides itWhat to change
TP03Time taken to complete the most recent repair, after they reported itThe gap between the report and the job being raisedTake reports at any hour and raise the job at first contact
TP07Whether you keep them informed about things that matterThe days between booking and completionSend an update at every change, not only appointment reminders
TP02Satisfaction with the overall repairs serviceFirst contact and the visitGive a reference number and a clear next step on the first call
TP06Whether you listen to views and act on themWhat happens after they raise somethingClose the loop: tell them what you did with the report
CH01Stage one complaints per 1,000 homesThe second chaseAnswer the “any news?” message before it becomes a complaint
TP09Satisfaction with complaints handlingWhether the complaint is resolved, not only answeredFix the cause and say so, within the Code’s timescales

What to have in place before the 2026/27 survey

The 2026/27 reporting year runs to 31 March 2027. Tenants surveyed in the coming months will judge their most recent repair.

  • One way to report, on every channel. Phone, WhatsApp, SMS and email should reach the same place, at any hour.
  • A timestamp at first contact. Record when the tenant reported, not only when the job was raised.
  • A reference and a next step on every report. The tenant should know what happens next before the call ends.
  • Photos at first contact. They speed up triage and cut repeat visits.
  • Written triage rules for emergency and routine repairs, aligned with your Awaab’s Law categories. Our Awaab’s Law guide has an example triage table.
  • Updates at every change. Booked, rescheduled, parts ordered, completed.
  • A report-to-job measure of your own. Track the hours between the tenant’s report and the job being raised, by channel and by time of day.
  • One record per case showing the report, the decision, the updates to the tenant and the closure, ready for a complaint or an Ombudsman request.

How do you know your reporting line works?

Test it the way a tenant would. Call your repairs line at 21:00 on a weekday with a made-up leak, then send the same report by WhatsApp and email. The next morning, check four things: when each report was logged against when you sent it, when a job was raised, whether you got a reference and a next step, and whether anyone updated you without being asked.

Then pull 20 completed repairs from last month and compare the report time with the job-raised time. If the median gap is more than a working day, that is where your TP03 points are. Repeat it every quarter and after any change to your contact centre hours or contractors. Do not take the vendor’s word for it, ours included.

When Kreedl is the wrong choice

If your low scores are in TP04 or RP01, the condition of the homes, a better reporting line will not fix them. Start with the stock condition survey and the investment plan. If your tenants strongly prefer face-to-face contact, as on estates with a resident caretaker, put the effort into the people on site. And if most of your reports already arrive in office hours and your report-to-job gap is under a day, your gains are in the repair itself, not in the first contact.

FAQs

They are the measures the Regulator of Social Housing requires every social landlord in England to collect and publish each year. There were 22 in 2025/26: 12 tenant perception questions and 10 management information measures on repairs, safety checks, complaints and anti-social behaviour. A 23rd, BS06 for electrical safety checks, is in the TSM Direction in force from 1 October 2026.

For low-cost rental homes, the median large landlord reported 74.2% overall satisfaction and the upper quartile 80%. For repair times (TP03) the median was 73.0% and the upper quartile 79%. Compare yourself with landlords of your type and size: smaller landlords and housing associations scored higher on average than large landlords and local authorities.

They must collect the measures and publish them to their tenants. Only landlords with 1,000 or more homes must also submit their results to the Regulator of Social Housing.

For large landlords the 2026/27 reporting year runs from 1 April 2026 to 31 March 2027. The 2025/26 return was due on or before 30 June 2026, and the results were published on 5 November 2026. Check the regulator’s guidance for the 2027 submission date.

No. The regulator says it does not use the TSMs as a regulatory tool in isolation and that no regulatory judgement is based solely on TSM results. They inform its view of how a landlord delivers the consumer standards.

It can remove the delays before a job is raised and send updates the tenant would otherwise chase, which is what those two questions ask about. It cannot repair the home. Kreedl offers a live test call at kreedl.com/try, so you can hear how it takes a repair report before you change anything.

Sources

  1. Tenant Satisfaction Measures 2025/26: Headline Report (Regulator of Social Housing, 5 November 2026)
  2. RSH data indicates increase in social housing tenant satisfaction (Regulator of Social Housing press release, 5 November 2026)
  3. Tenant Satisfaction Measures Requirements: Direction to registered providers (Regulator of Social Housing, in force from 1 October 2026)
  4. Transparency, Influence and Accountability, including Tenant Satisfaction Measures (Regulator of Social Housing)
  5. Information required from registered providers (Regulator of Social Housing)
  6. The Complaint Handling Code 2024 (Housing Ombudsman Service, statutory since 1 April 2024)
  7. Annual Complaints Review 2025-26 (Housing Ombudsman Service, 15 September 2026)

This article is general information, not legal advice. Figures and rules are correct as of 13 November 2026. Check the latest guidance from the Regulator of Social Housing and the Housing Ombudsman before you change your procedures.

Want to see it on your buildings?

Book a demo to see how Kreedl answers a night report, triages it against your rules and logs every step. Or call the agent yourself first.

Try it live